After a bit of a delay while Porter Davis made the changes to reduce our garage by 10cm we are back on track with a slab being poured.
It took the slab team the day before to finish off the slab setout. They work quickly installing all of the side boards, plastic liner, polystyrene pods/waffles, various steel reo and tied it all off as required.
At this point we had arranged for an inspection to be completed