Total Pageviews

Search This Blog

Showing posts with label Bathroom Option. Show all posts
Showing posts with label Bathroom Option. Show all posts

Wednesday, 10 May 2017

Kitchen and Bathroom Cabinets Arrived!

As the title says the kitchen and bathroom cabinets arrived yesterday 9/5/2017 and then today they were installed. Most of out benchtops are stone so they are completed later on. Now that the cabinets are in they can accurately measure the bench spaces and make the benchtops to suit. It is really good to see the spaces coming together as our home.

As I guess a lot of families do, we spend a lot of time

Friday, 30 September 2016

Update August/September 2016

Time goes so quick.

The last few months have been very busy including our tender appointments, yes appointment's', and contract signing. We had 2 tender appointments because at our first appointment we didn't feel comfortable signing. It felt a bit rushed at the eleventh hour. We knew our site costs were going to be high but couldn't get costings until tender. It made it difficult to make decisions on what we can include and what we can't. At the tender they still

Friday, 5 August 2016

Our Floorplans

Here are the plans/floorplans for our Waldorf 48.

When we sat with the various people involved at Porter Davis I would ask about the different floorplan and plan changes that are in the display vs the master plans. The significant changes are easy to notice like garage extensions but from the inside of display homes it's not always easy to spot smaller changes like living room extensions, plumbing void moves, balustrade instead of walls and so on. Our tender presenter was very good at going through everything with a fine tooth comb and we had taken heaps of photos of the display home both inside and out for reference. Below are the list of floorplan/construction changes from obvious to not so obvious.