The electrical rough in appeared to be fairly straight forward. A couple of days drilling holes and routing wires through the ceiling and wall spaces to all of the locations we had selected. We had added quite a few extras when it came to electrical with 74 downlights, numerous powerpoints added and several 2 way switches. We also made provision for lighting and electrical expansion into our outdoor space once that is constructed later on.
Total Pageviews
Search This Blog
Showing posts with label Rough in. Show all posts
Showing posts with label Rough in. Show all posts
Saturday, 8 April 2017
Rough In - Electrical and Data.
The electrical rough in appeared to be fairly straight forward. A couple of days drilling holes and routing wires through the ceiling and wall spaces to all of the locations we had selected. We had added quite a few extras when it came to electrical with 74 downlights, numerous powerpoints added and several 2 way switches. We also made provision for lighting and electrical expansion into our outdoor space once that is constructed later on.
Labels:
3 Phase,
Cameras,
Data,
Electrical,
Internet,
NBN,
Prewire,
Rough in,
Speakers,
Supervisor
Subscribe to:
Comments (Atom)