Tuesday 31 January 2017

Neighbour Fence Woes

It has been quite a while or at least it feels like forever that we have been planning our new home. We choose this, that, sign here and there, and get various approvals for our home to be built. Well it seems that there was one approval that was not requested. We planned to build on the boundary with our boundary taking the place of the existing fence. Although we have built before last time was in a developing estate with no fences. This time there was an existing fence to complete any works on that fence requires a fencing notice to be issued by us to our neighbor.

Monday 30 January 2017

Pre Slab Work

The guys have been busy with all of the groundwork that needs to be done before the slab is poured. We've have about 20 piers drilled and filled with concrete, electrical connection, plumbing connection, groundwater drainage completed and various other bits and pieces that need to be done before a huge piece of concrete lays over the top. Until now I was only assuming but yes, we do have 3 phase electricity available for our whole house refrigerated air-cond promo. Oh yeah, and at the end of this our neighbours are

Friday 20 January 2017

Site start

Well here it is, Site Start. Not much to tell here except that we have a toilet and an excavator came and moved some dirt around.

  • 19th Jan 2017: Official Site start
Porter Davis came through and actually started on the day they said they would. A toilet and waste cage were delivered to site.

Wednesday 11 January 2017

Good news at last - Site Start dates

After a while getting permits, approvals and everything just right we eventually got the good news of a site start. In late December we were advised of the potential of our build starting in Mid Jan. I wasn't overly confident but arranged for our block to be mowed and cleared just in case. Jump forward a few weeks to today and Porter Davis have come through with the goods. We have a site start set with the site cut booked for 19th Jan 2017 and as long as weather permits we will then have a slab pour on 2nd Feb 2017. Going by our contract time we will be in no later than mid September 2017. Lets see how it all pans out. Christmas lunch at our place this year I say!