Saturday, 18 February 2017

We have concrete! - Slab Pour

After a bit of a delay while Porter Davis made the changes to reduce our garage by 10cm we are back on track with a slab being poured.

It took the slab team the day before to finish off the slab setout. They work quickly installing all of the side boards, plastic liner, polystyrene pods/waffles, various steel reo and tied it all off as required.

At this point we had arranged for an inspection to be completed

Monday, 30 January 2017

Pre Slab Work

The guys have been busy with all of the groundwork that needs to be done before the slab is poured. We've have about 20 piers drilled and filled with concrete, electrical connection, plumbing connection, groundwater drainage completed and various other bits and pieces that need to be done before a huge piece of concrete lays over the top. Until now I was only assuming but yes, we do have 3 phase electricity available for our whole house refrigerated air-cond promo. Oh yeah, and at the end of this our neighbours are