Thursday, 3 August 2017
Electrical Fitoff
The electricians have been back to start the fitoff of electrical hardware. So far they have prepared all of the light switches, power points and light fittings. We made quite a lot of changes here and I need to check and double check that everything is how it's supposed to be.
Saturday, 8 April 2017
Rough In - Electrical and Data.
The electrical rough in appeared to be fairly straight forward. A couple of days drilling holes and routing wires through the ceiling and wall spaces to all of the locations we had selected. We had added quite a few extras when it came to electrical with 74 downlights, numerous powerpoints added and several 2 way switches. We also made provision for lighting and electrical expansion into our outdoor space once that is constructed later on.