Total Pageviews

Search This Blog

Monday 30 January 2017

Pre Slab Work

The guys have been busy with all of the groundwork that needs to be done before the slab is poured. We've have about 20 piers drilled and filled with concrete, electrical connection, plumbing connection, groundwater drainage completed and various other bits and pieces that need to be done before a huge piece of concrete lays over the top. Until now I was only assuming but yes, we do have 3 phase electricity available for our whole house refrigerated air-cond promo. Oh yeah, and at the end of this our neighbours are
refusing to allow the fence to be removed for our build to continue. The results in the next post






No comments:

Post a Comment