- 19th Jan 2017: Official Site start
- 20th Jan 2017: Site cut completed
- 21st Jan 2017: Site set out
Preparation for slab and pre-slab were completed. The site was cut and filled as per the excavation drawings. They have also prepared marker pegs to locate the building. It all becomes real at this stage and I can see more accurately where our house will sit on the block rather than just stepping it out. It is all very neat and tidy at this stage.
Pictures tell the story better.