Roouggghhh In's!

There is a reason they call it rough in stage. :-) Our site and work had been quite tidy until the sparkies and plumbers arrived. They are only there for a few days but wow they can make a mess. No big deal though, A quick sweep and fixed.

We've had a bunch of rough in's done over the last few weeks or so.



First up was the heater and AC unit installed in the roof space along with the gas lines to the outdoor compressor unit.


 Then came the plumbers for Gas, Water and Solar collector.






Next up were Ducted Vacuum pipes. We've got 6 vacuum inlets total including a kitchen kicker in the galley for quick tidy ups with a broom. We were advised that additional vacuum inlets were a better choice than lugging the extra length of vacuum hose around. I think that was sound advise for daily living. We also upgraded to the premium handle and hose set that includes switching on the handle and a protective sock on the hose to avoid accidental damage when dragging past furniture and walls.





Lastly there was electrical, data and other prewire rough ins. There is quite a bit to the electrical and data to I think it's best to do a separate post. See it here.